Before design revision
__________________________
Dimensions
*Only basic dimensions were considered but I'm always open to feedback as I usually miss a few things!
- Road -
Footpath - Traffic Lane - Parking Lane
Kerbs
- Bus -
Bus Lane width
Bus Lane marking
In-lane Bus Stop
Bus Shelter
(couldn't locate dimensions)
AS 1428.1 - 2001
- Lightrail -
Tram (Urbos 3)
- Traffic Signal Design -
Posts
Pavement Markings
Other Traffic Info
From my Nikon D5200 :)
__________________________
**Realised dimensioning was a whole section in itself. One guideline lead to another + reports in between.
Very excited about the whole light rail project (both this assignment and the actual one happening in the near future)
Will work on revised design soon :)
Things to revise
- Remove zigzag in track design
- Extra platform
- Straight track interchange (not loop)
- Relocation of interchange (closer to site boundary to maximise the park space)
- Relocate amenities
- Integration of cycleways + footpaths
Burnt out... that's it for now ZzzZzz
No comments:
Post a Comment